Our Past Jobs

Below is a brief sampling of just a few of our projects to demonstrate the scope of work and type of projects on which we perform:

Retaining Walls (MSE Panel & Welded Wire)

  • 11th Street Bridge Phase 1, Washington, D.C.
  • 11th Street Bridge Phase 2, Washington, D.C.
  • I-495 Hotlanes, VA
  • I-95 Hotlanes, VA
  • I-81 Truck Climbing Lanes, VA
  • Anacostia Riverwalk, VA
  • Inter County Connector Phase B, MD
  • VDOT 9B4, VA
  • I-270 @ Watkins Mill, MD
  • Downtown Midtown Tunnel, Portsmouth, VA
  • MLK Expressway/ Downtown Midtown Tunnel, Norfolk, VA

  


Segmental Block Retaining Walls

  • Shoppes at Dakota Crossing Phase 1
  • Shoppes at Arundel Preserve
  • Brunswick Crossing
  • Villages of Waugh Chapel
  • Roblee Drive Stream Bank Restoration
  • Westminster Marketplace
  • Waugh Chapel South
  • InterCounty Connector B
  • US Rt. 40 over the Patapsco River


Sound Walls

  • Lowes Harrisonburg, PA
  • Private development, Philadelphia, PA
  • BGE substation Baltimore, MD
  • I-85 Design Build Cabarrus County, NC
  • Crescents Development, MD
  • Martin Farm Development, MD

Porous Pavers

  • Sandy Point State Park
  • US Naval Academy Metzger Parking Lot
  • US Naval Academy Worden Field
  • Hancock's Resolution

EPS Foam Block Fills (Geo foam)

  • 11th Street Phase 1
  • 11th Street Phase 2
  • MLK Expressway/ Downtown Midtown Tunnel, Norfolk, VA